What a building permit? Calendar of Meetings Plenary

To introduce the discussion on the building permit, it is recalled

historical and technical bases.
The building permit is applied since the Act of June 15, 1943 under the Vichy government. He had, at the time, intended to simplify administrative procedures in a single document, replacing the various approvals necessary for the building process.
.
is an administrative permit required to build a building.
All texts regulating the right to building are intended to master:
.
·

·




Land speculation
The balance between developed and undeveloped areas. ·


The location and distribution of public facilities.
·
Protection of remarkable buildings and natural areas.

.

The regulations are those applicable locally such as the Land Use Plan (POS) gradually replaced by the Local Development Plan (PLU).
When at'on need to apply for a building permit? .

·

To create a gross floor area (SHOB) more than 20m ²
· When it comes to modifying the support structure or the facade of a building, and change the destination of the premises (eg: transforming an office building housing).
· When it comes to change the size of the building.
· When it comes to create or modify the openings (opening windows or doors) to an exterior wall.
The application must be filed and was educated at the town hall of the municipality where the project is concerned. In some cases (joint service with no instructor or very specific project) is the DDT, Departmental territories (formerly DDE), which investigated the case. As part of the investigation file is subject to the review of various services, such as firefighters for fire safety or building France to a protected site. .
The normal period of instruction is two months but can be extended from one to several months depending on the context of the project (perimeter buildings of France, a project of public assembly, etc ....). Once the permit is notified, it is published in the Town Hall (administrative view) and displayed by the applicant at the site of works. The statement by a bailiff display is recommended in difficult contexts (eg residents opposing the project who want to use the third party liability).
.
Thus, when the display begins a period of claims by third parties for a period of two months.

Warden also has two months to challenge the legality or legitimacy of the project. It is recommended not to begin work before the end of this period.

.
.
Finally, it is necessary to retain the services of an architect for any project Surface Work Out Net (SHON) exceeds 170 m²
.