The building permit was placed in the center of the debate the Commission's Housing and Living at the plenary meeting on 4 September 2010.
. .
We surveyed the arguments for and against the building permit. The aim is to construct the proposed improvement without a priori ideological.
.
What are the advantages of building permits?
.
.
•
landscape protection and environmental • harmonization of structures, in compliance with styles régionnaux
avoid anarchy and the law of the strongest
require a minimum level of architectural quality • zoning permit, particularly to avoid construction in areas at risk
•
enforce land use plans (POS) and coefficients of land use (COS)
enforce land use plans (POS) and coefficients of land use (COS)
• empower City: give the mayor a role of developer in
public facilities, road. •
prior control avoids the destruction of buildings in violation, which destruction is little used in reality.
• control of a public nature: documents permeis building are searchable by any citizen
fire safety guaranteed by the appraisal process, especially by the intervention of specialists •
audits are structured allow the use of third
• fight against speculative excesses
.
.
What are the disadvantages of building permits?
.
.
• housing shortage
• uniformity
• hindrance to creativity at the expense of architects
• stiffness is an obstacle to the freedom of building and innovation to the detriment of individuals
• complexity leads to a lack of readability for a particular
• technocratic drift and multiplication steps in the authorization
• instrument of a local potentate
• decision at the mayor is a scale too small for the Planning territory
•
prior control generates excess power, and decisions based on favoritism or personal enmities. control by public structures causes crashes due to red tape
• monopoly on the decision involves the risk of corruption
• electioneering
•
time education, defense, trial
• there is insufficient control over the issuing authority, particularly in terms of opportunity
• third party liability are abusive in their current form. The dilatory multiply.
• the additional administrative costs, delays and the imposition of a coefficient of land use are an obstacle to the construction
• There is an imbalance between those who have already Housing and whoever wants to build. Permit constuire is the means by which to protect the excess of benefits obtained.
• affect the individual right to build for yourself. Under Article 4 of the Declaration of Human Rights, I have a right if my right is respectful of the right of the other. (
Freedom is being able to do everything does not harm others: thus, the exercise of rights
each hom me has no limits except those which assure other members of the society the enjoyment of those rights) .
.
. .
.
The very existence of rules of planning and construction is desired by the Commission. In contrast, slow procedures and Malthusianism are reported. The risk of corruption and obstruction of the variety must find remedies.
. .
The first solutions have been launched during the meeting, and this work will be extended and made public on this blog.
0 comments:
Post a Comment